OVERVIEW OF TRADES BY STAGE
|
SITE PREP
|
Builder / Carpenter (if required) |
Electrician (temporary power and work required before slab) |
Plumber |
Building Certifier (set out) |
Termite Specialist (to discuss plan) |
|
STAGE 1 – THE FOUNDATION
|
Excavator |
Concretor |
Plumber |
Electrician |
Building Certifier (footings and slab) |
Termite Specialist |
|
STAGE 2 – THE FRAME
|
Carpenter (frame, roof truss) |
Termite Specialist |
Electrician |
Plumber (roof and guttering) |
Insulation contractor or carpenter (ceiling insulation after Electrician) |
|
STAGE 3 – TO LOCK UP
|
Carpenter |
Electrician |
Plumber |
Window supplier (or carpenter installs) |
Garage door supplier |
|
STAGE 4 – INTERNAL FITOUT
|
Plasterer (internal linings) |
Electrician |
Waterproofer |
Joiner (a carpenter who does the more detailed stuff) |
Kitchen manufacturer |
Carpenter |
Tiler |
Painter |
Plumber |
Various suppliers e.g. shower screens, mirrors, robes, carpet, blinds |
|
STAGE 5 – EXTERNAL FITOUT
|
Concretor/paver/landscaper/carpenter for decks |
Accessory installers eg gates/security. |
Termite Specialist (external treatment) |
Installers of window hoods, screens, features |
Carpenter – letterbox, clothesline |
|
COMPLETION
|
Electrical sign off |
Plumbing sign off |
Builder / carpenter for defects |
Cleaner (or Owner Builder) for final clean |
Certifier for final sign-off |