Is site clear and ready for set out? |
Check site for easments (no build zones) |
Is set out correct? Was it done by a Building Surveyor? Building Surveyor should set out external points of the building first |
Check if Certifier requires a Form 16 sign off from Surveyor at the end |
Are construction heights correct? This should have been done in initial design and certification |
Check if Certifier requires a Form 16 sign off from Surveyor at the end |
Has the electrician dug power mains for temporary power? |
Make sure they are deeper than other services so no one hits it during construction |
Have you discussed termite management plan with provider? That is, what's required at each stage? |
Certifier will want sign off at the end of the build |